All the latest news about HIMA

News & Events


All the latest news about HIMA - from company news to new products and trade fair dates, all the way to ongoing projects. We like to keep you up to date - because information builds trust.

 

 

17-11-2011 - Visit us at the SPS/IPC/Drives 2011 in Nuremberg/Germany

Visit us at this years SPS/IPC/Drives exhibition in Nuremberg/Germay. Get to know more about our machine safety solutions especially safety solutions for cranes and the rail sector. You will find us in hall 9, booth 305 from November 22 to 24.  

17-11-2011 - HIMA at the BCN Rail 2011

Visit us at the BCN Rail exhibition in Barcelona from November 29th to December 2nd. Meet us in hall 2, booth E533 and get to know more about commercial off-the-shelf safety controller for the rail sector.

17-10-2011 - HIMA SEA at the CIA 2011

HIMA SEA is taking part at the leading event in Asia for process control and automation, Controls Instrumentation and Automation 2011 (CIA2011). The  plant and safety conference will be held at Suntec Singapore from November 22-23, 2011.

more ...

14-10-2011 - HIMA SEA is participating at the Vietnam Oil & Gas 2011

HIMA SEA, a member of the worldwide HIMA Group, will take part at the Vietnam Oil & Gas 2011. The exhibition will take place from October 27 to 29 at the Giang Vo Exhibition & Convention Center in Hanoi, Vietnam.
Please visit us at our stand 3B-4, hall A3.

16-09-2011 - Keeping portal cranes at a safe distance - New anti-collision system for heavy-duty track-laying and renewal trains

EIC2 SA, agent of HIMA Paul Hildebrandt GmbH + Co KG in Switzerland, has developed a new anti-collision system for the P95 heavy-duty track-laying and renewal train produced by MATISA Matériel Industriel SA, Switzerland. This anti-collision system is based on HIMatrix safety controllers from HIMA, for which EIC2 developed special application software. ...

more ...

17-08-2011 - New ESD Systems Protect RWE Power’s Fortuna-Nord Plant

RWE Power AG has selected HIMA Paul Hildebrandt GmbH + Co KG to provide emergency shutdown systems (ESD) to protect hearth furnace boilers at the Fortuna-Nord plant in Bergheim (North Rhine-Westphalia), Germany. The plant manufactures lignite dust, fluidized bed lignite and hearth furnace coke. ... more ...

29-07-2011 - Sales growth and new investments in services, new markets and integrated applications

In the 2010 business year, HIMA achieved sales of €75.1 million, an 11% increase over the previous year. For the 2011 business year, HIMA is forecasting sales to increase at an even faster pace. ...

Download Press Release

25-05-2011 - Pioneering a safe railway switching solution - New safety system for the track changing equipment at the Emsland transrapid test facility

At 31.8 kilometers, the Transrapid Versuchsanlage Emsland (TVE) is the world's largest testing facility for magnetic levitation vehicles. The existing auxiliary operational control system for guideway switches (ZBW) hardware is to be replaced within the scope of an ongoing project. The contract was awarded by IABG mbH, which has been responsible for plant management of the TVE since 1984. A SIL 4 application (CENELEC) was implemented to ensure compliance with the safety requirements for operating high-speed maglev trains on the TVE and avoid impediments to future integration. A new safety system from HIMA now assumes responsibility for the signal integration of the remote switches to the central system. More ...

10-05-2011 - HIMA Americas Establishes Frame Agreement with BP Products North America To Provide Safety Instrument Systems For Five North American Refineries

HIMA today announced a five-year agreement between HIMA Americas, Inc. and BP Products North America, Inc. to provide its Safety Instrumented Systems (SIS) and Functional Safety Services to BP’s five North American refineries. More ...

09-11-2010 - New safety concept guarantee the future

Experience safety solutions of the future at SPS IPC Drives, Nuremberg, Germany. Visit us in hall 9, booth 305 from November 23-25, 2010. 

 More...

17-09-2010 - Experience first hand maximum safety and profitability

Get to know the benefits of the HIMA safety systems at HET Instrument, Amsterdam, 28.9.-01.10.2010 and register for the management game "Build Your Own Plant".

More ...

4-5-2010 - Fertiliser Giant Installs HIMax® Safety Controller

Yara Brunsbüttel GmbH Protects Brunsbüttel Factory with HIMA ESD system

Yara Brunsbüttel GmbH, a Yara International ASA company specialising in the production of ammonia and urea for the fertiliser industry, has installed the HIMax safety controller from HIMA Paul Hildebrandt GmbH + Co KG as part of its emergency shutdown (ESD) system for the Brunsbüttel factory's desulfurisation system. ...

more ...

10-12-2009 - State-of-the-Art Safety - HIMA Controllers Ensure Maximum Availability at Nordsee Gas Terminal

To modernize the safety technology used in its liquefied petroleum gas (LPG) storage facility in Brunsbüttel (Schleswig-Holstein, Germany), Nordsee Gas Terminal GmbH & Co. KG will rely on three H51q systems from HIMA Paul Hildebrandt GmbH + Co KG as emergency shutdown (ESD) systems. The systems help ensure safe operations at the only LPG sea import terminal in Germany. One H51q system will be used as operating and monitoring systems, while  two additional controllers will serve as safety systems for the re-liquefaction process. These additional two controllers will monitor two physically separated, low-voltage installations for monitoring the tank cooling temperature. This dual-systems setup is designed to ensure the highest possible process availability. ...

 

more ...

24-11-2009 - Redundant Link Supports Maximum Plant Availability - Redundant Link between HIMax and HIMatrix systems

HIMA announced that an embedded feature within its HIMax® and HIMatrix® systems enables customers to easily and quickly create redundant links between the systems to support application high availability on demand and fast reaction time.

more ...

24-11-2009 - HIMA Adds Certified Function Blocks to SILworX Engineering Tool

HIMA announced that certified function blocks for factory automation applications available with ELOP II Factory software are now also available with the popular SILworX® engineering tool.

more ...

23-11-2009 - SEW-EURODRIVE and HIMA Sign Development Agreement - Safety-related controller for decentralized drivers

One year after announcing their mutual technology partnership, SEW-EURODRIVE and HIMA today signed a new agreement for developing the safety-related controller HM31 for use in SEW-EURODRIVE’s decentralized drivers and application solution MOVIPRO®.

more ...

4-11-2009 - Gjøa pipeline: reducing costs with high pressure - New pipeline protection system from Statoil

A new type of flow-based pipeline protection system (PPS) for the new Gjøa field in the Norwegian sector of the North Sea will lead to significant savings in pipeline costs and higher pressures for gas transport. The process on which PPS is based has been developed and patented by Statoil. Bjørge Safety Systems AS (BSS), the Norwegian agent of the company HIMA Paul Hildebrandt GmbH + Co KG, has implemented the PPS with HIMA’s safety system H51q.

more ...

26-10-2009 - HIMax system guarantees maximum availability of chlorine plant - New HIMA safety system safeguards continuous chlorine production process at Vinnolit Gendorf

HIMax is safeguarding the chlorine production process at Vinnolit GmbH & Co. KG’s Gendorf facility. The leading German PVC manufacturer was won over by HIMA’s total redundancy concept, which guarantees the continuous operation of the chlorine plant. “The performance of the PES was one of the things that swung the decision in favour of HIMax. It has the performance needed for the machine applications, especially the pump limit regulation,” explains Peter Grandl, EMR technician in the chlorine production area at Vinnolit GmbH & Co. KG Burgkirchen.

more ...

23-10-2009 - Showroom in France, Le Havre, 18.-19. November 2009

HIMA France organizes 2 showrooms inside of France. The focus lays in the presentation of HIMax, HIQuad and HIMatrix combined with all services as safety consulting and project management & engineering. The first showroom took already place in Martigues and was very successful. Costumers and system integrators assured themselves about the advantages of the HIMA solutions.

 

Next showroom:
France, Le Havre, 18.-19. November 2009

Contact

14-10-2009 - High availability at a glance - HIMax from HIMA as a visualisation and operation component at INEOS Köln

HIMax is now in use at INEOS Köln (Germany, Cologne) as a high-availability operating and visualising component for remote monitoring of safety technology in a production plant. The challenge in this application is the length of the optical fibre used for high-speed data transmission.

more ...

17-8-2009 - New Sales Structure at HIMA - Focusing on international business

As the new  Executive Vice President Sales Process Automation and Service, Thomas Hinzmann will manage global sales activities for HIMA.

Thomas Hinzmann, with degrees in electrical engineering and business (Master of electrical engineering and Master of business administration), has extensive experience in sales. Previously, he worked as Director of Sales Rosemount Europe for Emerson Process Management.

Thomas Hinzmann will assume the duties of Dr. Hans-Jörg Kmiecik, who becomes Vice President Global Project Pursuit and will be responsible for the acquisition of major projects. This position was created to ensure the long-term growth of the company internationally. 

5-8-2009 - Commissioning time reduced to a minimum

HIMA modernises ESD system in hexane oxidation plant at LANXESS

In a hexane oxidation plant belonging to LANXESS AG at the Krefeld-Uerdingen Chemical Park (North Rhine-Westphalia region), HIMA Paul Hildebrandt GmbH + Co KG is upgrading an existing HIMA ESD (Emergency Shutdown) system. Because LANXESS planned to shut down the plant for a very short period before commissioning, it decided to conduct a Factory Acceptance Test (FAT) using the expanded and modernised safety system.

More ...

14-7-2009 - HIMax provides reliable protection against cyber attacks

HIMA safety system obtains Achilles Level I security certificate

HIMA has obtained security certification in accordance with Achilles Level I for the new HIMax safety system. In numerous tests, both the X-CPU 01 processor module and the X-COM 01 communication module in HIMax have proven their resilience and robustness against massive cyber attacks.

More ...

23-6-2009 - Maximum availability when loading

New HIMax safety system protects Ineos vinyl-loading system

The Voslapp plant at the port of Wilhelmshaven is one of the biggest sites operated by the INEOS ChlorVinyls Group. At the factory, a combined process produces polyvinyl chloride (PVC) of different qualities, ethylene dichloride (EDC) and vinyl chloride monomer (VCM). ...

More ...

12-05-2009 - New Partnership for safety solutions in Portugal

HIMA + Optieng offer optimised safety solutions for industrial processes. More ...

17-3-2009 - HIMax ensures Flexibility of Burner Control System - Evonik Degussa uses new safety system from HIMA at factory in Kalscheuren

The Evonik Degussa GmbH factory in Kalscheuren near Cologne is the largest European producer of carbon black. During the production of carbon black, the residual gas is used for steam and electricity generation in the thermal afterburning plant. If a boiler stops functioning, however, a gas flare system starts operation to burn the residual gas. As part of renovation work, the boiler control and monitoring system for the gas flare was automated using the new safety system HIMax from HIMA. More...

Archive 2008

Archive 2007

Event overview

Please click to here to see all current HIMA events.